How does crossing a movable bridge work?
The Netherlands has more than 1500 movable bridges. What rules do you have to observe when passing, when do you have to wait, what do the lights mean and how do you ensure that the bridge keeper notices you?
All about the Dolderbrug, location, opening hours and contact details. On the water map below do you see the bridge in its immediate vicinity. On the right on this page you will find the operating times of this bridge, if available the maritime radio data and telephone numbers, and any additional instructions.
 
Open the Water Map for Steenwijkerland in full window
The Netherlands has more than 1500 movable bridges. What rules do you have to observe when passing, when do you have to wait, what do the lights mean and how do you ensure that the bridge keeper notices you?
Als je de Waterkaart Live app gebruikt, kun je zelf vaarroutes plannen en opslaan. Daarbij houdt de route rekening met de hoogte van bruggen (en sluizen) op je route. Het gebruik van de routeplanner is eenvoudig, op deze pagina leggen we uit hoe het werkt. Deutsche Version โฆ
Waterkaart.net is nu uitgebreid met de Inland ENC navigatiekaarten van Rijkswaterstaat. Ze bevatten zeer veel details over het water. Je kunt deze heel makkelijk als een extra kaartlaag aanzetten. Zo werkt dat. Deutsche Version ๐ฉ๐ช | English version ๐ฌ๐ง IENC โฆ
Goed nieuws voor wie door Noord-Holland vaart: vanaf nu kun je via Waterkaart Live automatisch brugopeningsverzoeken laten sturen. Zo wordt varen een stuk makkelijker en hoef je minder te wachten. Je hoeft alleen de Netwerk-AIS functie aan te schakelen. Zo werkt dat. โฆ
Dolderbrug
Vertical clearance when closed: 1.7 meter, width: 8.12 meter.
Number of openings: 1
Note: vertical clearance compared to Channel level, take possible water level changes into account.
Comment bridge management (NL): Er is de mogelijkheid de brug in de toekomst beweegbaar te maken.
VHF-Channel: channel not specified
Due to the poor condition in which the bridge was wrong it was necessary to strengthen the existing bridge deck in view of road safety. An auxiliary structure under the existing bridge deck has been installed in such a way that the load capacity for road traffic is sufficient. As a result, the bridge is no longer mobile and the passage height is also reduced from 1.70 m. to 0.90 m.
The board of the municipality of Steenwijkerland still has to make a final decision on the follow-up steps to be taken. The measures taken are therefore for an indefinite period.
(mail: Gemeente Steenwijkerland 29-06-2007)
All days, between 00:00h and 23:59h - No service
Operating times all year round
From 01-01 tot 31-12:
Due to the poor condition in which the bridge was wrong it was necessary to strengthen the existing bridge deck in view of road safety. An auxiliary structure under the existing bridge deck has been installed in such a way that the load capacity for road traffic is sufficient. As a result, the bridge is no longer mobile and the passage height is also reduced from 1.70 m. to 0.90 m.
The board of the municipality of Steenwijkerland still has to make a final decision on the follow-up steps to be taken. The measures taken are therefore for an indefinite period.
(mail: Gemeente Steenwijkerland 29-06-2007)
All days, between 00:00h and 23:59h - No service
Administrator
Gemeente Steenwijkerland
Postbus 162
8330 AD Steenwijk
Administrator visiting address
Vendelweg 1 Steenwijk
Phone: 0521-527700
Data updated: 02 December 2024, 09:50 uur, all data comes directly from Rijkswaterstaat systems.